Field notes
What an Inventor automation audit actually looks like
A work-prep lead once walked me through a release package the way you would walk someone through a fire drill: everything in order, nothing wasted, and the whole thing taking four hours longer than it should.
Forty drawings. For each one, the same five moves: open the drawing, retype the client name into the title block, retype the revision, export a PDF, rename the file so the shop can find it. No step was slow. The sum was a working day and a half, every project, for years.
That is the shape of the problem an audit looks at. Not "can this be automated", which is almost always yes, but "which of these five moves is worth removing first, and what does removing it actually cost".
Two days, one page
The review I still run before quoting a package is two days of my time and it produces one page. Not a deck. A page, because a page is the only thing that survives the meeting it gets discussed in.
That page has four parts:
- A map of how a drawing currently gets from model to released, in the order the steps actually happen.
- The steps ranked by hours returned per hour invested, with the arithmetic shown.
- What the first tool would be, precisely enough to argue with.
- What should not be automated, with the reasons.
Part four is the one that earns the fee. Anyone can list what to automate. The list of what to leave alone is the part that requires having watched it fail.
The twelve checks
The audit runs the same twelve questions every time. They are the ones that separate a workflow with a hole in it from a workflow that just feels slow.
- How many manual steps between "model finished" and "drawing released"? Count them.
- Where does the BOM come from: the assembly, the drawing, or a spreadsheet someone maintains by hand?
- Is part numbering generated or typed?
- Which title-block fields are re-entered per drawing?
- How are revisions propagated: manually, or by iLogic?
- How many drawings per project, and how long does the release package take?
- Is there a batch export step? Who runs it, and how often?
- What data goes to the machines, in what format, and who converts it?
- Which standard parts are modelled fresh every time instead of reused?
- Where do the same three parameters get changed by hand in ten places?
- Which steps only one person knows how to do?
- What breaks most often, and is it usually found before or after release?
Most of these are answerable in a conversation. Item 1 is not. Counting steps means sitting with the person doing the work while they do it, because the steps people remember are the ones that feel like work, and the expensive ones are the ones that feel like nothing.
The worked example
The numbers below are a composite, built from workflows I have watched and cleaned up, not one client's books. It is realistic, and it is the arithmetic the audit does out loud.
Forty drawings per project. Twenty-five minutes each of title-block and export work. That is about sixteen and a half hours per project, roughly two working days, spent on steps whose content is already known to the model.
Four projects a year, so sixty-six hours. Then the revision pass, which is the same five moves again but only on the drawings that changed: call it a third of the set, twice per project, so another eleven hours per project, forty-four for the year.
A hundred and ten hours a year, most of it in the last week before release, which is also the week when a wrong sheet costs the most.
The tool that removes the title-block and export moves is small: read the model's properties, write them into the title block, export the sheets with the revision in the filename. It is the kind of thing that takes a follow-up work and then runs on a button for years.
What it does not remove is the checking, and nobody should want it to. A tool that fills forty title blocks in four seconds still needs a human to look at whether the client name is the client, which is the standard the whole practice runs on.
How the hours are counted
Two rules keep the arithmetic from flattering itself.
Count the defects separately. A wrong sheet that reaches the shop is not five minutes of re-export. It is the phone call, the stop, the re-release, and the reason the shop now checks everything twice. Counting only the re-export makes every workflow look cheaper to leave alone than it is.
Count the interruption cost. A half-day of clicking is not recovered by doing it faster in one block. It is recovered by not having it in the diary at all, which is a different number and usually a bigger one.
The output is a range, not a figure. Anyone quoting a single number of hours saved from a two-day audit is quoting the number that makes the pitch work.
What the deliverable looks like
One page, plus the notes behind it. You get:
- the flow map, with the steps named the way your team names them
- the ranked list, cheapest first, with hours and risk next to each item
- a one-paragraph specification for the first tool: inputs, outputs, and the one thing it deliberately will not do
- a section on what to leave alone, and what would have to change for that answer to change
There is no dashboard and no maturity score. A number out of a hundred would be invented, and the moment you ask how it was calculated, the whole page stops being useful.
When the answer is "don't automate this"
Roughly a third of the audits I expect to run will end with part four being the long part. The cases are recognisable:
- The work does not repeat. A one-off project with a bespoke drawing set gets no return from a tool, because the tool needs the second project to pay for itself.
- The input data is not trustworthy. If the part numbers are typed by hand and wrong a tenth of the time, automating the export moves the error faster and makes it harder to find.
- The bottleneck is not the CAD. A release package that spends two days waiting for approval is not waiting for a button.
- The tool would need an owner who does not exist. Anything that depends on a master data set nobody maintains becomes the next thing that breaks, and it breaks silently.
- The exposure is regulatory. Where a stamp or a signature carries liability, automating the paper around it is fine, automating the decision is not.
Saying that in the audit is the point of charging for the audit. A fee agreed before work starts means the answer can be "spend nothing this year" without the invoice becoming a problem.
What it costs, and why it is fixed
Two days, one week from the call to the page. The fee is agreed before the work starts, has no hourly component, and does not change if the answer is "leave it as it is".
That is deliberate. Hourly audit work rewards the auditor for finding complexity, and the only honest way to sell a piece of work whose best outcome is "do nothing for now" is to be paid the same either way.
If the review says automate, the tooling gets built as part of the drawing work, with a fixed scope and the source handed over. If it says don't, you have a page that explains why, which is cheaper than finding out with a failed project.
This is the review I run before quoting a package. It is not currently sold as a separate two-day engagement; the entry point now is one assembly, detailed, and you can see that on services.