RCG Solutions

Work

One frame, in preparation.

A conveyor frame drawn to the level a shop works from, published sheet by sheet as each one is issued. Below it, the tooling built for that work — with its limits written on every card, because a tool that is half-built is not a tool you can plan around.

01Engineering work

A frame that has to carry somebody else's magnet.

No client artifact is citable, so this is my own work, done once and published as it is issued. The magnet is bought, the belt is fixed and the working gap is a number the drawing has to hold — which is where most of the engineering in a frame like this actually sits.

ItemWhat it isStatus
01

Overbelt magnet frame

One-off welded and bolted frame hanging over a belt: mass and centre of gravity per assembly, per-lug suspension loads, a working gap that is a design constraint rather than a detail. RVS316L chute, HEB 160 in S355J2, NEN-EN 1090 inputs written into the package.

No sheets yet. The drawings go up here as they are issued, one at a time — nothing on this page is a rendering of work that does not exist.

In preparation
sheets as issued
02Tools

What each one does, and what it will not.

Status is the status. A tool that is half-built is not a tool you can plan around.

Drawing kitv0.1 in build

Title blocks and the batch release

Syncs every title block from the model it belongs to, then exports the whole set as PDF and DXF. Apache-2.0, C# against the Inventor API.

Not shippedNothing to download or try yet. The rules behind it are on the automation page.
DSTV exportplanned

Assembly to machine file

Members, holes, copes and scribing, per machine dialect, checked back against the model it came from.

Not shippedWaits for a paying reason. Plate nesting belongs to the shop's software, not to this.
Inventor agentplanned

The drawing package, proposed

An agent that reads an assembly and proposes views, dimensions from datums, and the parts list, with the guardrails documented.

Not shippedWhere its output cannot be checked against a rule, it will not be sold as a tool that works.
03What you can check today

While the sheets are drawn, two things are already published.

The method the frame is being drawn to, and the package it will arrive as — both described in full, which is more than a screenshot of a half-built add-in proves.

The method

How the automation is built

ISO 7200 title block, the four notes, the material library, the six rules the code is held to, and how the template enforces all of it.

How it is built
The package

What a package contains

Four artefacts, what each one is for, and the six things a drawing package does not include unless agreed.

What you get

Send a drawing, a STEP file or a sketch. You get a fixed price for the assembly within one business day.

Every set is modelled, drawn and checked by the engineer who quoted it. A formal error in a drawing I issued is corrected at no charge — and the number comes by reply, not by call, unless the scope needs one.

Send a drawing